RETURN TO INDEX

DONCASTER WORKS

 

PART 17  -  CLASSES INTRODUCED BY GRESLEY - GNR

 

A 4-6-2

A1. new design (4/1922)

D 4-4-0

D3. D2 with larger boiler (11/1912)

H 2-6-0

H2. new design (8/1912)

H3. H2 with larger boiler (4/1914)

H4. 3 cylinders (3/1920)

J 0-6-0

J4. J5 with larger boiler (5/1912)

J23. new design (12/1914)

K 0-8-0

K2. K1 with larger boiler (2/1914)

N 0-6-2

N2. improved N1 with superheater (12/1920)

O 2-8-0

O1. new design (12/1913)

O2. O1 with 3 cylinders (5/1918)

 

RETURN TO INDEX