The early engine orders down to EO226 were recorded by the Locomotive Drawing Office in a retrospective EO book (started in 1901). Their accuracy has to be taken on trust, but they do leave some questions. Based on the best available information, the engines ordered around 1895-96 were as follows. Presumed dates in square-brackets. Amendments to the original order in curved brackets:

 

Engine
Nos.
Ivatt
Class
Date
ordered
EO
No.
Dome/
domeless
Date
built
Builder Remarks
1021-30 J9 5/1895 - domeless 2-4/1896 Doncaster Stirling order
1031-45 J6 [1/1896] - domeless 6-7/1896 Dubs  
1046-60 J14 1/1896 - domeless 7/1896 Neilson  
1061-70 E1 [1/1896] - (domeless) 2-5/1897 Doncaster amended to domed
1071-80 D2 25/1/1896 201 (domeless) 5-6/1897 Doncaster amended to domed
1081-90 J5 [1/1896] - domeless 9-12/1896 Doncaster  
1091-1100
J5
mid-1896
-
(domeless)
12/1897-3/1898
Dubs
amended to domed
111, 155 J14 [1896] 202 domeless 8/1897 Doncaster EO202 assumed
(1101-10)


J13


18/8/1896


203


(domeless)


8-10/1897


Doncaster


amended to domed
engines numbers altered
to 1201-10
(1111-15)
J14
9/1896
-
domeless
6/1897
Neilson
engine numbers altered
to 1211-15

 

In addition No. 400, the prototype 4-4-0 (built 12/1896) was ordered some time during 1896, and treated as a "replacement" (though the engine it replaced was a goods engine). It would appear that the EO system was started about May 1897, starting retrospectively with EO201 (order issued 1/1896, but at present under construction).

For details of Tender Orders see Part 26.

 

Engine

Order

Date

issued

GNR

Class

Engine Nos.

Renewal

or

Capital

Remarks

201

25/1/1896

D2

1071-80

R

Screw coupling between
engine and tender
(though general
Arrangement dwg. Q53
shows central coupling)

202

-

J14

111, 155

R

No confirmation seen that
this is correct

203

18/8/1896

J13

(1101-10)

1201-10

R

-
Numbers altered

204

/1896

D2

1301-10

C

Screw coupling between
engine and tender

205

18/1/1897

C2

1009/10/13-20

C

 

206

12/5/1897

C1

990

C

Central coupling between
engine and tender

207

13/5//1897

D2

1311-20

R

Screw coupling between
engine and tender

208

13/5/1897

J5

315/16/18/29/31/32/34/36-38

R

 

209

15/7/1897

D1

1321-25

C

Central coupling between
engine and tender

210

21/12/1897

A4

266

R

Central coupling between
engine and tender

211

6/1/1898

D1

1326-35

C

Central coupling between
engine and tender

212

6/1/1898

C2

1501-10

C

 

213

6/1/1898

D2

1341-45

1346-50

C

R

Screw coupling between
engine and tender

214

13/8/1898

C2

1511-20

C

 

215

5/1/1899

A5

267

R

(coupling not mentioned,
though no doubt Central)

216

5/1/1899

D1

1336-40, 1361-65

R

Central coupling between
engine and tender

217

5/1/1899

J5

343-45/48-53/59-64/67/68/71/75/81

R

 

218

6/1/1899

C1

949/50/82-89

C

 

219

22/2/1899

D2

1351-60

C

 

220

26/10/1899

J5

165/77/79/80/92, 302-04/06/08,
384/86-88/90/92/94/96/98/99

R

 

221

26/10/1899

D1

1366-75

1376-85

R

C

 

222

1/8/1900

A5

92, 100, 261-65/68-70

R

 

223

6/4/1900

C2

1521-30

C

 

224

24/11/1899

C1

271

R

 

225

12/12/1899

J14

1046-48/50/51

-

Conversions to condensing
retaining their old boilers

226

6/4/1900

K1

401

R

 

227

1/8/1900

J13

1251-70

R

 

228

/1900

J14

928/27/64/79, 1054

-

Conversions to condensing
fitted with new boilers

229

29/6/1901

K1

402-11

R

Use SO1093 for material

230

17/12/1901

C1

(251-60)

252-60/50

R

Material for No. 251

transferred to EO232

 

 

 

Engine

Order

Date

issued

GNR

Class

Engine Nos.

Renewal

or

Capital

Remarks

231

7/1/1902

K1

412-21

R

Use SO1116 for material

232

1/5/1902

C1

251

R

 

SO1007

?

D1

1386-95

R

Coupled axles, tyres, piston rods, cabs,

splashers etc., but not the frames

233

28/10/1902

K1

(422-41)

422-40

R

SO1169 for ironwork

441 deleted, see EO235

234

18/12/1902

C2

1531-40

R

SO1008 for ironwork

235

6/2/1903

L1

116

R

Material from EO233

236

18/5/1903

C1

272-91

R

 

(237)

18/5/1903

(K1)

(441-50)

R

Cancelled. See EO243

238

18/5/1903

L1

117-26

R

SO3647 for ironwork

239

10/5/1904

C1

292

R

 

240

22/9/1904

C1

293-99, 300/01, 1400

R

 

241

7/12/1904

C1

1401-10

R

 

242

19/12/1904

J13

1271-80

R

 

243

19/12/1904

L1

127-36

R

Material from EO237 “where possible”

244

20/4/1905

MR

1, 2

R

Rail motors

245

9/8/1905

C1

1411-20

R

 

246

9/8/1905

L1

137-56

R

 

247

26/1/1906

K1

441-45

R

 

248

7/5/1906

C1

1421

R

 

249

6/9/1906

C1

1422-31

R

 

250

22/11/1906

C2

1541-50

R

 

251

4/1/1907

N1

190

R

“2nd hand boiler to Works Order 10770”

252

6/3/1907

D1

1396-99, 1180

R

Order probably cut down from 10 to 5 (-/1908)

253

6/3/1907

C1

1432-41

R

 

254

5/6/1907

N1

1551-60

R

 

255

21/10/1907

C1

1442-51

R

 

256

30/1//1908

J21

1-15

R

 

257

1/7//1908

J13

1281-90

R

 

258

28/9/1908

D1

41-50

R

 

259A

259B

27/1/1909

K1

446-50

451-55

R

Saturated boilers

Superheated boilers

260

31/3/1909

J22

31-40

R

 

261

14/9/1909

N1

1561-70

R

 

262

9/12/1909

J22

21-30

R

 

263

20/2/1910

C1

1452-61

R

 

264

10/6/1910

N1

1571-80

R

 

265

18/10/1910

D1

51-65

R

 

266

5/4/1911

J22

521-35

R

 

267

11/7/1911

N1

1581-95

R

 

268

10/11/1911

N1

1596-99, 1600-05

R

 

 